NORTH CRETAN SEA.
SEA SURVEY FOR UNDERWATER CABLE INSTALLATION
WILL BE CARRIED OUT BY VESSEL ‘NG WORKER’
FROM 200700Ζ UNTIL 22700Ζ JAN 25
IN THE AREA BOUNDED BY:
35 30 28N – 025 13 23E
35 30 12N – 025 13 34E
35 29 22N – 025 22 32E
35 28 55N – 025 22 50E
AND IN THE AREA BOUNDED BY:
35 26 19N – 025 43 49E
35 25 47N – 025 49 03E
35 26 24N – 025 46 24E
35 26 15N – 025 47 43E
AND IN THE AREA BOUNDED BY:
35 25 55N – 026 12 26E
35 25 16N – 026 14 35E
35 21 54N – 026 25 06E
35 22 12N – 026 25 22E
35 25 55N – 026 12 26E
WIDE BERTH 1NM REQUESTED.
Home » 83/2025 – NORTH CRETAN SEA. SEA SURVEY FOR UNDERWATER CABLE INSTALLATION.