75/2025 NORTH CRETAN SEA. GEOPHYSICAL SURVEY FOR UNDERWATER CABLE INSTALLATION.

NORTH CRETAN SEA.
SEA SURVEY FOR UNDERWATER CABLE INSTALLATION
WILL BE CARRIED OUT BY VESSEL ‘NG WORKER’
FROM 180700Ζ UNTIL 20700Ζ JAN 25
IN THE AREA BOUNDED BY:
35 29 50N – 024 59 06E
35 30 28N – 025 13 23E
35 29 22N – 025 22 32E
35 28 55N – 025 22 50E
35 30 12N – 025 13 34E
35 29 45N – 024 59 24E
WIDE BERTH 1NM REQUESTED.

Shopping Basket
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    Scroll to Top
    Skip to content